De-stumping and grading

6th July-11th August 2013

Things were starting to look a little more civilised by this point, and a little less like a wasteground.

I dug out the tree trunks remaining from the original clearing 2 years back and increased the height of the wall on the right hand side of the garden in order to provide support for the raised ground level.

Then we graded the ground, Ju laid out the shape of the flower beds using rocks, we installed sleepers (and some more plants) and finally, prepped the whole of the upper area of the garden for grassing.